Close Menu
    Hala DXBHala DXB
    • Home
    • Contact Us
    • Automotive
    • Business
    • Entertainment
    • Health
    • Luxury
    • Lifestyle
    • News
    • Sports
    • Technology
    • Travel
    Hala DXBHala DXB
    Home » Sinopec’s Ziyang Dongfeng Shale Gas Field Reports Proven Reserve of 235.687 Billion Cubic Meters
    PR Newswire

    Sinopec’s Ziyang Dongfeng Shale Gas Field Reports Proven Reserve of 235.687 Billion Cubic Meters

    May 13, 2026
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    ZIYANG, China, May 13, 2026 /PRNewswire/ — China Petroleum & Chemical Corporation (“Sinopec”, HKG: 0386) has announced a major shale gas exploration breakthrough of its “Project Deep Earth – Sichuan and Chongqing Natural Gas Base”. The Ziyang Dongfeng shale gas field, operated by Sinopec, has secured official approval for proven geological reserves of 235.687 billion cubic meters from the Ministry of Natural Resources of China. This marks the birth of China’s first ultra-deep, 100-billion-cubic-meter-level shale gas field, pushing exploration and development beyond 4,500 meters.

    Sinopec’s Ziyang Dongfeng Shale Gas Field Reports Proven Reserve of 235.687 Billion Cubic Meters.

    The Ziyang Dongfeng in the Sichuan Basin is a large, integrated shale gas field discovered in the Cambrian Qiongzhusi Formation, the earth’s oldest commercial shale layer, formed 540 million years ago. Buried 4,500–5,200 meters deep, it posed globally recognized exploration challenges such as unclear reservoir characteristics, complex accumulation mechanisms, thick difficult-to-drill formations, and extreme heat and pressure.

    The Sinopec team moved beyond conventional exploration models. By integrating AI into geophysical imaging, they effectively “CT‑scanned” subsurface formations, enabling clear reservoir identification and gas detection. Combined with breakthroughs in ultra‑deep drilling and fracturing, these efforts have yielded a fully proprietary technology system for Cambrian ultra‑deep shale gas exploration.

    “After over a decade of persistent effort, we have taken Cambrian shale gas from zero to a hundred-billion-cubic-meter-scale reserve base. This validates the formation’s vast potential and gives us a replicable technical pathway to expand China’s shale gas development frontier,” said Liu Wei, director of Sinopec Southwest Petroleum Bureau and representative of Sinopec Southwest Oil & Gas Company. “Our next step is to drive high-quality exploration and production, accelerate capacity growth at Ziyang Dongfeng, and contribute to secure national energy security.”

    Sinopec continues to drive the high-quality development of China’s shale gas industry. In 2012, Sinopec discovered the Fuling shale gas field, launching China’s commercial shale gas development and making China the third country (after the U.S. and Canada) to achieve commercial-scale shale gas production. By 2017, Sinopec had built Fuling into China’s first 10-billion-cubic-meter-capacity shale gas field.

    Pushing into deeper formations, Sinopec proved the Weirong shale gas field (2018), the Qijiang shale gas field (2022), and, in 2025, the Yongchuan and Hongxing fields, each with reserves exceeding 100 billion cubic meters.

    For more information about Sinopec’s efforts and achieved milestones on shale gas exploration, please visit http://www.sinopec.com/listco/en/.

    Logo

    Photo – https://mma.prnewswire.com/media/2979114/Image.jpg
    Logo – https://mma.prnewswire.com/media/960416/5968382/SINOPEC_Logo.jpg

     

    Cision View original content:https://www.prnewswire.co.uk/news-releases/sinopecs-ziyang-dongfeng-shale-gas-field-reports-proven-reserve-of-235-687-billion-cubic-meters-302770837.html

    Related Posts

    Apollo Hospitals launches ‘Always Open, Always Here’, a global first in healthcare from India

    August 20, 2026

    LG EMPOWERS DESIGNERS AND VIDEOGRAPHERS WITH NEW ULTRAFINE EVO 6K MONITOR

    August 20, 2026

    Gas Land Expands Advanced Nitrogen Engineering for Global LNG Infrastructure

    August 20, 2026

    Robo.ai Inc. Provides Business Update and Announces Interim Report Release Schedule

    August 20, 2026

    CIMC Modular Building Systems Ships First Modular Hotel Project to Saudi Arabia

    August 20, 2026

    yomo Secures Initial Banking Licence, Ready to Lead Egypt’s Digital Banking Evolution

    August 20, 2026
    Latest News

    Magnitude 6.1 quake shakes Indonesia near South Nias

    August 19, 2026

    NORTH SUMATRA / RankWire.AI / – A magnitude 6.1 earthquake struck offshore near Indonesia’s North Sumatra province on Tuesday, sending tremors across several parts of Sumatra. The quake occurred at 1:02:23 p.m. western Indonesian time, equivalent to 06:02:23 UTC. Its epicenter lay about 147 kilometers…

    DRC Ebola outbreak hits record with 2,325 deaths

    August 17, 2026

    DRC malaria toll nears 30,000 deaths after 26 million cases

    August 17, 2026

    Magnitude 5.4 quake hits Gilgit-Baltistan near Sost

    August 14, 2026

    South Korea car exports set July high at $6.24 billion

    August 14, 2026

    Global electric vehicle sales rise 9% in July 2026

    August 14, 2026

    Total eclipse tracks across Russia, Iceland and Spain

    August 13, 2026

    Etihad adds nonstop Abu Dhabi Gothenburg winter flights

    August 13, 2026
    © 2026 Hala DXB | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.